↓

Orange Lining

PUBLIC ART FOR THE PORTLAND – MILWAUKIE LIGHT RAIL TRANSIT PROJECT

Orange Lining
Home Menu ↓
Skip to primary content
Skip to secondary content
  • Home
  • Selected Lines
  • Blog / Project Updates
  • Art Starts Now
  • About & Contact
Home→Blog→Uncategorized→Printed fencing: rolled, installating and installed →In field set up

Image navigation

← Previous Next →

In field set up

Published July 18, 2012 at 1296 × 929 in Printed fencing: rolled, installating and installed
Peg pound in stakes to hold up backer boards.

Peg sets up bracing prior to spray painting a line of text on previously installed fencing. Location is SW Naito at SW Lincoln.

Image navigation

← Previous Next →
© 2013 - Orange Lining Proudly powered by WordPress  Weaver II by WP Weaver
↑